SPECLIAZED ITALIAN FOUNDATION CO. LTD., (SIFCO), recognizes the growing public concern about damage to the environment as a consequence of economic development. As a famous Engineering Firm/Contractor and as a responsible member of the business community, SIFCO believe the balance must be struck between desirable development and the protection of the environment. SIFCO intends to play it’s part by continually seeking ways to prevent pollution and minimize the effects of its office and site based activities on the environment.

To implement this policy the company will:

a) Adopt as principles the prevention of pollution and waste and the efficient use of materials and energy.

b) Keep abreast of the relevant environment legal requirements and emission
standards and to comply with them. 

c) Review its activities and determine those, which could have significant impact on the environment.

d) Set objectives and targets for the progressive reduction of significant
impacts.

e) Establish a programme with timescales to meet the targets and review progress against those targets periodically.

f)  Implement an environment management planning procedure for site based activities to ensure that environmental requirements are identified and managed to the extent that they are under control of the company. Such control will be integrated with the existing management system for Quality, Safety and Health and will cover the activities carried out by our experienced Staff Members.

g) Provide the necessary awareness and training to enable staff at all levels to understand and contribute to the implementation of the policy.

h)  Maintain a policy for continuous improvement of the Environmental
      Management system and environmental performance.

i) This policy will be communicated to all employees and sub-contractors and will be available to the clients/public on request.

As the Environmental Policy Management System is an integral part of the Management process existing within SIFCO, the Administrative Director/Executive Director require the active co-operation of all members of staff (especially Branch Managers) to ensure the effective delivery of services to our valued clients.

1. INTRODUCTORY HEADINGS


1.1   INTRODUCTION TO CONTRIBUTING PARTIES


1.1.1      SCOPE OF WORKS


The purpose of this Quality Assurance Plan (QAP) is to describe briefly the Quality system which will be applicable for execution and realization of piling works. 


1.2 QUALITY APPROACH


The quality approach operated by SPECIALIZED ITALIAN Foundation Co. is in accordance with the requirement of ISO 9002. The aim of the approach will be to comply with all quality requirements as specified in contract documents, applicable codes & standards. The Quality Plan describes the various procedures and works activities that have to be carried out.  Those procedures give brief and more detailed procedures and contained with the company documentation currently under implementation (reference is made to relevant procedures).  The Quality Plan also took necessary steps to ensure the effective application of the proposed system taking into consideration the Contractor's Quality Documents to control any possible discrepancy and non conformity.


1.3 QUICK PRESENTATION OF THE CONTRACT


The main purpose of this contract is to Construct Piling & Shoring Works



2. QUALITY SYSTEM ELEMENTS


2.1 MANAGEMENT RESPONSIBILITY


2.1.1   QUALITY ASSURANCE MANAGER 


  Responsible to: Engineering & Administrative Director

                                                                          

  Responsibility: Executive Manager & Quality Assurance Engineer


  Quality Control Engineer: Safety Officer


Basic Function: Establish & Implement the Company Quality


Management System in accordance with ISO 9001, 2008 Establishment of the Company Safety Policies & System.


  1. Secant pile walls
  2. Contiguous pile walls
  3. Spaced pile walls
  4. Diaphragm walls
  5. Soldier pile walls
  6. Sheet pile walls
  7. Soil nail walls
  8. Permanent and temporary ground anchors
  9. Shotcrete
  1. Bored piles
  2. CFA piles
  3. Barrette piles
  4. Micropiles

1.    Off-shore piles:

§  Timber

§  Precast

§  Tubular

§  Cast-in-place

§  Sheet piles

2.   Dewatering

3.   Cavity probing &grouting

4.   Instrumentation

5.   Pile testing:

§  Static pile load test

§  Dynamic pile load test

§  Low strain integrity test (PIT)

§  Thermal Integrity Profiling (TIP)

§  Cross hole sonic logging (CSL)

§  Caliper logging test

§  Gamma-gamma logging (GGL)